Most Popular  
 
 
 
Adjustment to the Operation of Wenzhou Line S1
【Fonts: Large Medium Small 【Source: Wenzhou·China 【Date: 2019.08.29】

Recently, Wenzhou Mass Transit Railway Investment Group issued the Notice on the Adjustment to the Operation of Wenzhou Rail Transit Line S1, according to which the first train arrives earlier at each station. In fact, this adjustment has also brought other changes to public travel.

According to the new timetable, the first train arrives at all stations before 6:30 a.m. so that passengers at any station can take it at about 6:30 to Wenzhou South Railway Station.

Compared with the past, now the last train from Tongling Station to the Olympic Sports Center Station departs 1 to 4 minutes earlier at each station, and the last train from the Olympic Sports Center Station to Tongling Station is put off from 20:30 to 20:50. The operation duration of each station is extended for about 20 minutes as well.

Adjustment to the departure time of the first train will bring about different arrival time of all trains at each station. So for those who used to arrive in the nick of time, it’s better to set out 10 minutes earlier.

In the past, the train would stop at Wenzhou South Railway Station, Longxia Road Station and Yaoxi Station for 1 minute respectively, and at other stations for 40 seconds. Now, it will stop at Wenzhou South Railway Station for 50 seconds, at Olympic Sports Center Station for 60 seconds, and at other stations for 35 seconds. With the increase of speed from 51 kilometers per hour to 53 kilometers per hour, the one-way travel duration from Tongling Station to Olympic Sports Center Station is shortened by about 2 minutes and 20 seconds.

It should be noted that in the past, after the train from Tongling Station to the Olympic Sports Center Station arrived at the Olympic Sports Center, it would stay at the platform for the up direction (heading to Tongling Station) until all passengers got on or off and return to Tongling Station. Therefore, there was no need to carry out the passenger clearance procedure.

However, after August 22nd, passenger trains, after arriving at the Olympic Sports Center Station, will stay at the platform for the down direction and go further to Shuang’ou Avenue Station without passengers for subsequent debugging operations in the eastern section of the line. As a result, station staff and drivers need to clear passengers at the Olympic Sports Center Station. It is expected that all passengers getting off at the Olympic Sports Center Station can cooperate with the working staff.

Print Close
Produced By 大汉网络 大汉版通发布系统