1.Beiji 300,000-ton Crude Oil Transfer Dock Base
【Fonts:Large Medium Small 】 【Print 】 【Close

  Project No: 01

  2.   Name: Beiji 300,000-ton Crude Oil Transfer Dock Base

  3.   Location: Rui'an City

  4.   Background and Construction Condition:

  Wenzhou municipal government puts forward the strategy of implementing “the construction of Wenzhou on the base of its sea resources” to speed up the exploration of sea resources and strengthen the development of harbors, transfer trade as well as oil and natural gas industries. The project of Beiji 300,000-ton Crude Oil Transfer Dock Base which scheduled to be strategic storage, transfer base in eastern China and the important rear base of East Sea oilfield mainly conducts the business of oil storage and transfer, Two 300,000-ton berths for loading and unloading the crude oil ships ranged from 100,000 to 300,000-ton in transmission and storage are scheduled to be built. Two 100,000-ton berths for 30,000-100,000-ton oil ships will be built to transport the storage oil.

  Beiji Islands stands in the southeast coast of Zhejiang Province, and is about 40 km away from the southeast coast of Ou River estuary of Wenzhou. It consists of Beiji, Xiaao Island, Guanlao'ye Mountain and so on. Since its geography advantage, it can be the first choice of building the strategic oil-storing base in our country. It has good harbor construction conditions with the average water depth around it being over 20 m . Also the 300,000-ton tanker can enter the deck directly. Beiji Islands located in the southwest coastline which enjoys good wave sheltering condition to build big deepwater berths. After reclamation of the tideland, it can cover 2 sq. km land area. Under the condition of less population, and quite a distance from the mainland (37 km from Ruian City), huge-sized oil tank field can be built here.

  The Program of Beiji 300,000-ton Crude Oil Transfer Dock Base of Wenzhou and its feasibility study have been finished. The information such as the water depth survey, the geological prospecting, hydrology survey and so on have been collected while the preparatory work includeing the feasibility study has been undertaken.

  5.   Construction Scale and Target:

  A 300,000-ton crude oil transfer dock berth will be constructed in the primary phase, with a short-term handling capacity of 20 million ton.

  The preliminary investment is about 1 billion yuan.

  6.   Cooperation Form and Content:

  Joint venture and cooperation. The Chinese partners invest in cash ,land and coast utilization rights way while foreign partners with foreign currency.

  7.   Conditions Provided by the Project Sponsor:

  The government will complete the tideland reclamation and construction of the collecting and distributing transport road and facilities. They will also afford the right to utilize the sea area and land.

  8.   Sponsor Unit: Wenzhou Port and Shipping Administration Bureau

  Persons to Contact: Zhuang Xiao rong    Chen Cun

  Tel: 0086-577-86051986   86061940

  Fax: 0086-577-86061931

  Postcode: 325000

  Add: D Building, East District of Zhanqian, Wenzhou, Zhejiang

  E-mail: wzghgh@126.com

Home | Contact Us
Copyright 2007 Wenzhou Municipal People's Government All Rights Reserved.
Produced By 大汉网络 大汉版通发布系统